• Continuing Ed
  • Distance Learning
  • Staff Intranet
  • SD42
  • Parent Portal

PMSS

École Secondaire Pitt Meadows

  • Home
  • Parents
    • Attendance
    • Bell Schedule
    • Code of Conduct
    • Electronic Devices
    • Fair Notice
    • 2025-2026 Grade 9 Immunizations
    • Non-Instructional Days
    • Parent ‘How To’s’
    • Parking at PMSS for Parents/Visitors
    • PMSS PAC
      • PAC Constitution and Duties
      • PAC Meeting Information & Dates
    • Parent/Guardian Weekly Communication Tool
    • Report Card Assessment Info
    • Reporting Periods
    • School Growth Plan
    • School Safety Notification System
    • Student Technology Etiquette
  • Students
    • PMSS Daily Announcements
    • Academic Honesty
    • Attendance
    • Bell Schedule
    • Code of Conduct
    • Electronic Devices
    • PMSS Course Selection for 2026-2027
    • Grad Class 2026
    • Library
    • My Class Student Guide
    • Office 365 Access
    • Student Technology Etiquette
  • Staff
    • Administration
    • Administrative Support
    • Counselling Staff and Work Experience
    • Educational Support & Cafeteria Staff
    • Teaching Staff Emails
  • Calendar
    • 2025-2026 PMSS Calendar
  • Departments
    • Career Centre
    • Counselling
    • Immersion Française
    • Math Curriculum
    • Music
    • Other Departments
  • Newsletters

June 3, 2026

June 3, 2026: Pitt Meadows Secondary School Replacement Project Update

We are pleased to announce that the design of the new Pitt Meadows Secondary School (PMSS) is nearing completion and that testing and work on parts of the school site will be starting in early June.

Before construction begins, an archaeological investigation will be conducted on the site. This will involve digging test pits in select locations and screening the soil for any archaeological finds.

The contractor will begin bringing in trailers and equipment in early June, with main activities starting in July after classes end. Construction will be split into three phases:

  • Phase 1 (early works) will run from June to November 2026. This phase will include excavation, utility services installation, tree cutting, and soil removal in preparation for the construction of the main school building. The pick-up and drop-off zone to the north of the existing school will be adjusted to allow safe access for vehicles during construction. Trees that will not be removed will have protective fencing installed.
  • Phase 2 (main building construction) will begin in early 2027.
  • Phase 3, the final phase, will cover demolition of the old building, landscaping, and construction of the new parking lot and turf field, with the project completing in 2030. 

The attached map highlights the areas closed off during Phase 1 and 2 of the construction and shows an alternate pedestrian route from 116B Avenue to Pitt Meadows Athletic Park.

The safety of students, parents/guardians, teachers, and staff will be a top priority throughout construction. The construction team and school administration will stay in regular communication, and we will keep families and the wider community informed as work progresses.

For your information, an overview of construction-related activities from June to August 2026 is below:

  • June 2, 2026: Closure of the north-east access road
  • June 8, 2026, onward: Daily closure of approximately 20 parking stalls for the archeological test pits
  • June 18, 2026: Modification of the north-east drop-off area
  • June 26, 2026: Closure of the turf field and south-east stair access
  • July 10, 2026: Closure of west access road
  • August 21, 2026: New access pathway to Pitt Athletic Park will be created

Thank you to the Pitt Meadows community for your support of the replacement project. We will continue to provide updates as construction progresses. We will share additional details in the fall.

Article by Irena Pochop / Announcements

Upcoming Events

Jun 22
All day

Continuous Learning Day (ABCD)

Jun 23
All day

Continuous Learning Day (EFGH)

Jun 23
All day

Valedictory/Graduation Ceremony @ Chandos Pattison Auditorium

Jun 24
All day

FINAL Report Cards out on MyClass at 3:00 p.m.

Jun 25
All day

School closes for summer holidays

Jun 25
All day

Year-end administrative day

Jun 25
All day

Year End Admin Day

View Calendar

Contact

19438 -116B Avenue
Pitt Meadows, BC
V3Y 1G1
tel. 604.465.7141


Parent and Student Links

Ministry of Education and Child Care
PMSS Career Centre
PMSS Library

Staff Links

Ministry of Education and Child Care
School District 42
TOC Booking

Copyright © 2026 · Pitt Meadows Secondary School · Log in