• SD42
  • Staff Intranet
  • MySD42
  • Continuing Ed
  • Distance Learning
  • Parent Portal

MRSS

Maple Ridge Secondary School

  • Home
  • About Us
    • MRSS 45 Year Reunion
    • Community Resources
    • French Immersion
    • Staff Resources
  • Contact Us
  • Parents
    • Gr. 8 Orientation Day 2025
    • School Opening 2025
    • Bell Schedule
    • Calendar of Events
    • Check Student Attendance
    • Classroom Assessment & Reporting
    • Fair Notice Student Safety
    • Grade 8s September 2025 – Welcome to Ridge
    • How to View eReport Cards
    • Inclement Weather
    • MyClass
    • PAC
    • Parent Portal
    • Registration & Transfers
    • School Growth Plan
    • School Locator
  • Students
    • ATHLETICS – Sports at Ridge
    • Bell Schedule
    • Cafeteria Menu
    • Career Centre
    • Clubs & Committees
    • Code of Conduct
    • Core Competencies
    • Course Planning 2025/2026
    • Financial Assistance for Post Secondary
    • Graduation – Updates Pending
      • Grad Programme
      • Grad Ceremony Bio Form
      • Grad Newsletter 2025
      • Grad Parent Presentation 2024
      • Mechanical Bull Waiver
    • Scholarships, Awards & Bursaries
    • Literacy & Numeracy Assessment

February 1, 2022

SD42 Draft Strategic Facilities Plan: Survey

The Maple Ridge – Pitt Meadows Board of Education invites you to participate in a survey on the Draft Strategic Facilities Plan recommendations. This survey asks for your input on a number of facilities planning draft recommendations, which were shaped by the feedback we collected through the first phase of our Facilities of the Future consultation process and the data collected in the Strategic Facilities Review.

The follow-up survey will be open from today, Tuesday, February 1, 2022, to 4 pm, Tuesday, February 15, 2022.

START THE SURVEY

For a summary of the feedback collected so far, download our Facilities of the Future Public Consultation Summary document. A summary of draft recommendations is included starting on page 60 of our Draft Strategic Facilities Plan. To learn more about the strategic facilities plan development process, visit the district website.

The Board of Education will consider all feedback and adopt the new Strategic Facilities Plan in March 2022.

Thank you for participating in the Facilities of the Future engagement process.

Board of Education
Maple Ridge – Pitt Meadows School District

 

 

 

FACILITIES OF THE FUTURE
PUBLIC ENGAGEMENT TIMELINE
June 2021 – February 2022

 

Article by Gary Mckenna / Today at Ridge

  • Home
  • About Us
  • Contact Us
  • Parents
  • Students

Copyright © 2025 · Maple Ridge Secondary School · Log in

af Afrikaanssq Albanianar Arabicbn Bengalibs Bosnianzh-CN Chinese (Simplified)zh-TW Chinese (Traditional)cs Czechnl Dutchen Englishtl Filipinofr Frenchde Germanel Greekgu Gujaratihi Hindiig Igboid Indonesianit Italianja Japanesekm Khmerko Koreanku Kurdish (Kurmanji)lt Lithuanianml Malayalammr Marathine Nepalips Pashtofa Persianpl Polishpt Portuguesepa Punjabiro Romanianru Russiansr Serbiansd Sindhisk Slovakes Spanishsw Swahilisv Swedishta Tamilte Teluguth Thaitr Turkishuk Ukrainianur Urduvi Vietnameseyo Yoruba
en English